LG Hai Phong
Hai Phong, Vietnam

Challenges
- Challenges is to perform the installation in the limited time and must meet the requirements of fire protection
Solution
- 15 FS * 3 LAYER/ FS 25mm (DHS - U50). FS: 120 min
- STC: 44 DB and max height: 6.7m
Project information
Client
LG Electronics
Main contractor
LG Hausys
Architect
FECON
Sectors