Address

Saint-Gobain Vietnam Ltd.
9th Floor, IPC Tower
1489 Nguyen Van Linh Street, Dist 7, HCM City

Subscribe to our newsletter

The National Assembly House

Hanoi, Vietnam

Toa nha quoc hoi

The National Assembly House was constructed in the political centre of Hanoi, with modern facilities over five floors and two basements, within a total area of 60,000 sq.m. There is a 17,000 sq.m. underground parking area on three basement levels, while the tunnel connecting the Houses of Parliament and the campus of the Ministry of Foreign Affairs is 60 meters long. There are also two separate lanes for pedestrians and cars.

Challenges

  • All partition require a capacity of hanging heavy object
  • Designed to conform to IHG standard, all partitions require minimum one hour fire protection
  • Project needed to complete in a short time 

Solution

  • Gyproc Robust system with Gyproc Duraline board provided high impact resistant performance, with one hour fire resistant, 50dB sound insulation
  • Fixing & hanging heavy object up to 400 kg
  • Fast & easily installation, excellent finishing

Project information

Client

Ministry for Foreign Affairs of the Socialist Republic of Vietnam

Main contractor

Bauer

Architect

GMP International GmbH – Inros Lackner AG

Sectors

Technical Consultant Center Tel: 1900 1108

We use cookies to ensure that we give you the best experience on our website. if you continue without and close this layer, we'll assume that you are happy to receive all cookies from us, if you want to get more information, please refer to our dedicated page about our cookies